
Running the Sulzer bagged to break in the rings.
Sulzer C5T220.3 After 10,000 Rebuild
First CNG Station at Kansas City Aviation Department 1996. Hurricane CNG 60 CFM. 460 Ford Left bank was 4 stage compressor Right bank engine.
Running the Sulzer bagged to break in the rings.
Sulzer C5T220.3 After 10,000 Rebuild
First CNG Station at Kansas City Aviation Department 1996. Hurricane CNG 60 CFM. 460 Ford Left bank was 4 stage compressor Right bank engine.